About the company

Taured S.A is a company with a dynamic development curve. We do not yet have a long list of success stories to share, but we are ready to demonstrate our portfolio of major projects.

Our mission

The reason we decided to create our own project management company, Taured S.A., is that we believe we know what is missing in big business today.


Nuclear Medicine: Cutting Cancer Mortality by a Quarter

Oncologist and Doctor of Medical Sciences, Professor Aleksey Butenko, reveals the specifics behind PET-CT and why this diagnostic method is vital.

Read more ...

A network of nuclear medicine centres to cover Russia

A country-wide network of nuclear medicine centres is being set up in Russia. The project is conducted by “PET-Technology”, a company belonging to the RUSNANO group, with the participation of private investors. The idea is to create modern highly specialized diagnostic centres based on a method called positron-emission computerized tomography (PET/CT). This is one of the most promising methods for diagnosing cancers, as well as heart and neurological diseases.

Read more ...

A data center is a centralized repository for the storage, management, and dissemination of data and information organized around a particular body of knowledge or pertaining to a particular business.

Every organization has a data center, although it might be referred to as a server room or even a computer closet. Today, centralized storage facility geared to retain database information is a must for the decision-making processes of an organization.

We are proud to be chosen by investors to be at the heart of such a challenge - manage the construction of the Russian biggest data center with total floor-space of 8,700 sq.m.

Datacanter outside view 1


Key project advantages


    • Protection from technological disasters, dedicated uninterrupted power supply systems (UPS) with generating capacities (17 MW), automatic fire suppression system

    • Multi-level Security System, including the industrial park common secured area, the dedicated facility perimeter fence security and interior security systems: security and fire alarm, access control and CCTV

    • Raised-floor industrial climate control system

    • Fiber-optic communications paths, connecting the Data Center with 10 and 9 hub sites

    • Raised-floor space available (5,000 square meters), meeting major clients' requirements

  • Office space and infrastructure available for clients' IT-divisions

Data center inner view

Areas (squaremeters):


30 000
Annex Building
1 800
Main Building
8 700
Raised Floor
5 000
1 400
1 600

Power Allocations(pieces)


Racks maximum
1 800



Overall PowerDelivered, Mwatts
Average IT Watts persqm
1 615
Average kWatts perRack

Key partners



A transnational corporation, one of the largest manufacturers of computers, infrastructure equipment and software offering consultancy.Consulting services for data centers: design based on the best IBM international practices and experience. Core tenant.

Total Site Solutions (TSS)

A daughter company of Fortress International Group (NASDAQ.FIGI), specializing in providing a single source solution for companies requiring highly technical facility integration and precise project execution for mission-critical facilities. The team offers a full spectrum of services that include planning, programming, design, engineering, design management, construction management, commissioning and facility maintenance services.



Cost Model Budget

The major part of the Project costs is the cost of the high-tech equipment, likely to output the needed power, as well as comply with the requirements specified for the Facility tier classification.

Total investments: USD 260 million

Datacenter cost model budget


Project schedule


Basis of Design (BOD)
3 months
Long Lead Equipment (Specifications & Bidding)
3 months
Schematic Design
3 months
Phase I (Shell, Annex, Offices, Site & IBM Tenant)
9 months
Phase II (2nd Half of the Raised Floor)
6 months

Key suppliers

American Power Conversion

Uninterrupted Power Supply Galaxy 9000


Generator Set, Engine C 175-16, Terberg genset control unit

RC Group

Chiller system

Transfer Equipment Vostok

Complex engineering infrastructure solutions


Cooling, conditioning and ventilation engineering solutions


The official exclusive dealer of companies CATERPILLAR, CLAAS, AGCO, PONSSE, TEREX in the Central, North-West and South-West RF regions


TAURED S.à.r.l. 18, rue Siggy vu Lëtzebuerg, L-1933 Luxembourg
Phone: +352 24836958 Fax: +352 24836959

© 2009 Taured S.à.r.l.